{"id":3207,"date":"2026-11-06T09:31:20","date_gmt":"2026-11-06T09:31:20","guid":{"rendered":"https:\/\/newsraise.com\/in\/2026\/11\/06\/bda-elevated-corridor-ballari-road-traffic-restrictions\/"},"modified":"2026-11-06T09:31:20","modified_gmt":"2026-11-06T09:31:20","slug":"bda-elevated-corridor-ballari-road-traffic-restrictions","status":"publish","type":"post","link":"https:\/\/newsraise.com\/in\/2026\/11\/06\/bda-elevated-corridor-ballari-road-traffic-restrictions\/","title":{"rendered":"BDA to Build 4\u2011Lane Elevated Corridor on Ballari Road, 18\u2011Month Traffic Restrictions Imposed"},"content":{"rendered":"\n<!-- Quick Adsense WordPress Plugin: http:\/\/quickadsense.com\/ -->\n<div class=\"9fece8afa224fd09e54b043d0febfb58\" data-index=\"1\" style=\"float: none; margin:10px 0 10px 0; text-align:center;\">\n<script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script>\r\n<!-- NR ATF -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-8898941184964366\"\r\n     data-ad-slot=\"4839033563\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script>\n<\/div>\n<p>Commuters who normally travel the stretch of Ballari Road between UAS Staff Quarters and Mehkri Circle will face an 18\u2011month period of diversion, as the Bangalore Development Authority (BDA) has launched a four\u2011lane elevated corridor project. The construction is slated to begin on 6\u202fNovember\u202f2026 and is expected to run for a year and a half.<\/p>\n<h2>Scope and timeline of the elevated corridor<\/h2>\n<p>The BDA\u2019s initiative aims to create a four\u2011lane elevated passage that will run directly over the existing Ballari Road corridor, linking the UAS Staff Quarters area with Mehkri Circle. By elevating traffic, the authority intends to ease congestion in the long term, but the immediate effect will be a complete shutdown of certain vehicle categories along the affected segment. The project\u2019s 18\u2011month duration places the completion date around mid\u20112028, assuming the schedule remains unchanged.<\/p>\n<h2>Traffic restrictions imposed by Bengaluru Traffic Police<\/h2>\n<p>In anticipation of the construction\u2011related bottlenecks, the Bengaluru Traffic Police (BTP) have enforced strict movement limits on the portion of Ballari Road that falls under the jurisdiction of the Sadashivanagar and Sanjaynagar traffic police stations. All classes of goods vehicles\u2014including Light Goods Vehicles (LGVs), Medium Goods Vehicles (MGVs) and Heavy Goods Vehicles (HGVs)\u2014are barred from using the road. In addition, both Karnataka State Road Transport Corporation (KSRTC) buses and private bus operators are prohibited from traversing the stretch. The ban also extends to any other vehicle type that would normally use the corridor, with the exception of emergency services, which are advised to follow the alternative routes outlined by the police.<\/p>\n<h2>Alternative routes for traffic heading to Kempegowda International Airport<\/h2>\n<p>Drivers intending to reach Kempegowda International Airport (KIA) via Hebbal are directed to a series of detours that bypass the construction zone. One recommended path starts at Old High Grounds Junction, proceeds to Kalpana Junction, then to Old Udaya TV Junction, continues past Cantonment Railway Station, follows Tannery Road to Nagawara Road, and finally merges onto the airport\u2011bound highway. For motorists originating from Yeshwanthpur, the suggested diversion involves taking Mathikere Road, turning right at BEL Circle, and joining the Ring Road that leads directly to the airport. These routes are intended to keep freight and passenger traffic flowing while the elevated corridor is built.<\/p>\n<h2>Detours for vehicles returning from the airport to the city<\/h2>\n<p>Vehicles traveling from KIA back toward central Bengaluru have two primary options. The first advises drivers to take a left turn at Hebbal, head toward Nagawara Junction, then make a right onto Bamboo Bazaar and continue along Queens Road into the city core. The second alternative suggests a right turn at Hebbal onto the Hebbal Ring Road, passing through Kuvempu Circle and reaching Goraguntepalya Junction; from there, a left turn onto Dr. Rajkumar Road leads into the central districts. Both pathways are designed to avoid the construction zone while maintaining reasonable travel times.<\/p>\n<h2>Additional city\u2011bound diversions from Yeshwanthpur and Hebbal<\/h2>\n<p>For traffic originating in Yeshwanthpur and heading toward the city, the police recommend proceeding via BHEL Junction, then taking a right near Maramma Circle onto Margosa Road, which leads directly into the urban area. Vehicles coming from Hebbal are instructed to descend the Hebbal Flyover, enter the service road located in front of Baptist Hospital, and follow this service lane up to CBI Junction. From CBI Junction, drivers may rejoin Ballari Main Road and continue toward the city centre. A separate set of directions is provided for those traveling from Hebbal toward Anand Nagar and RT Nagar: after using the same service road past Baptist Hospital, motorists should turn left at CBI Junction onto Anand Nagar Main Road, then proceed to RT Nagar and Jayamahal Road.<\/p>\n<h2>Impact on commuters and expectations<\/h2>\n<p>The comprehensive set of diversions reflects the BTP\u2019s effort to mitigate disruption during the prolonged construction period. By prohibiting all goods vehicles and public buses on Ballari Road, the authorities aim to reduce the risk of accidents and ensure that the construction crew can work safely. While the restrictions will inevitably add distance and travel time for many commuters, the detailed alternative routes are intended to provide clear guidance and prevent gridlock on adjacent streets. Residents and regular users of the corridor have been urged to plan their journeys in advance and to stay informed of any further updates from the traffic police as the project progresses toward its 2028 completion target.<\/p>\n\n<div style=\"font-size: 0px; height: 0px; line-height: 0px; margin: 0; padding: 0; clear: both;\"><\/div>","protected":false},"excerpt":{"rendered":"<p>The Bangalore Development Authority will begin work on a four\u2011lane elevated corridor on Ballari Road on Nov.\u202f6, 2026, prompting an 18\u2011month ban on goods vehicles and buses and a set of alternate routes for commuters.<\/p>\n","protected":false},"author":2,"featured_media":3208,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[299],"tags":[3608,3609,3607,3610,3611],"class_list":["post-3207","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ballari-road","tag-bda-construction","tag-bengaluru-traffic","tag-kempegowda-international-airport","tag-traffic-diversion","entry"],"_links":{"self":[{"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/posts\/3207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/comments?post=3207"}],"version-history":[{"count":0,"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/posts\/3207\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/media\/3208"}],"wp:attachment":[{"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/media?parent=3207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/categories?post=3207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsraise.com\/in\/wp-json\/wp\/v2\/tags?post=3207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}